日韩成人久久久_成人一二三区视频_国产精品日本一区二区_亚洲欧洲在线观看

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1499 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 安龙县| 来宾市| 门头沟区| 双流县| 宁波市| 沈丘县| 瑞昌市| 九台市| 弋阳县| 顺昌县| 红桥区| 阿坝| 巨野县| 新野县| 长海县| 阿克陶县| 稻城县| 安阳县| 乌鲁木齐县| 永州市| 潞西市| 松潘县| 民县| 栾川县| 民和| 平湖市| 和顺县| 南充市| 双柏县| 沙湾县| 江口县| 天津市| 鲁甸县| 忻城县| 霍林郭勒市| 定安县| 广东省| 乐安县| 黄大仙区| 秭归县| 延津县|