日韩成人久久久_成人一二三区视频_国产精品日本一区二区_亚洲欧洲在线观看

Contact Us

Tiny Cooling Fan programming principles

Date: 2015-5-28   Click: 1526 Times

"Tiny Cooling Fan" use zero-crossing triac trigger, controlled by the microcontroller triac off, by changing each control cycle on and turn-off thyristor communicate complete full-wave signal number to adjust the load power, and thus achieve speed control purposes. Because INT0 signal reflects frequency voltage zero-crossing time, so "Tiny Cooling Fan" as long as the external interrupt 0 interrupt service routine complete control door opening and closing, and the use of the interrupt service frequency counts to control the amount of n and judgment that every interrupted once, to be n minus 1 count, if n is not equal to 0, to maintain control level "1" to continue to open the control door; if n = 0, then the control level is reset to "0", close the control gate, SCR zero trigger pulse is not passed. Control volume requirements such "Tiny Cooling Fan" can be obtained in accordance with the control process, to achieve zero-crossing triac control, so as to achieve the effect by controlling the amount of control to achieve speed is adjustable.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

主站蜘蛛池模板: 宝兴县| 台前县| 虞城县| 茌平县| 建德市| 莱西市| 阳西县| 元江| 宁河县| 丹阳市| 兰溪市| 松潘县| 海口市| 论坛| 贵溪市| 资源县| 麻江县| 金坛市| 福安市| 牡丹江市| 浦县| 新竹市| 福建省| 出国| 鹤岗市| 扎鲁特旗| 綦江县| 万荣县| 靖西县| 珲春市| 黄平县| 和政县| 西盟| 清丰县| 海伦市| 明星| 乃东县| 扬州市| 温泉县| 修水县| 叶城县|